Managing Waste From Power Generation

Power and Utility | DATE POSTED: April 28, 2016

A power plant in Camden, TX, used GeotubeĀ® technology to dewater the 1 million gallons of ash sludge in its wastewater lagoon. GeotubeĀ® units removed all of the sludge over 30 days saving the plant $60,000 and allowing the recovery of the material for road applications.

DOWNLOAD PDF