Municipal | DATE POSTED: April 26, 2016
A paper mill in Ancram, NY, run by Schweitzer-Maudit, required dewatering of its secondary treatment lagoons sludge. A dredge removed over 3285 cubic yards of sludge held within over 300 foot of GeotubeĀ®. This method was high volume and low cost at achieving the desired goal.
DOWNLOAD PDF