Call Us: 343-361-0463 | Subscribe to our Newsletter

Dewatering Paper Mill Lagoon Sludge in Ancram, New York

Municipal | DATE POSTED: April 26, 2016

A paper mill in Ancram, NY, run by Schweitzer-Maudit, required dewatering of its secondary treatment lagoons sludge. A dredge removed over 3285 cubic yards of sludge held within over 300 foot of GeotubeĀ®. This method was high volume and low cost at achieving the desired goal.

DOWNLOAD PDF