Geotube® Dewatering Technology Provides the Perfect Solution for Waste Treatment

Municipal | DATE POSTED: April 26, 2016

In 2005, the Eganville Wastewater Treatment Plant acted as the site for a Geotube® pilot project with the installation of a 22’ x 22.5’ Geotube® unit. The Geotube® was filled with septage that was allowed to dewater over the winter months with great success. Subsequently, a permanent Geotube® facility was installed on site.

DOWNLOAD PDF