Shoreline Protection | DATE POSTED: April 26, 2016
Round Lake, Ontario, regularly faces property damage through erosion and ice destruction every winter. Previous methods were unsatisfactory, so Bishop Water constructed a 100ft Geotube® across the shoreline to act as a long term preventative measure. Success of the project is based on the lack of further erosion.
DOWNLOAD PDF