Municipality of McDougall

Municipal | DATE POSTED: April 28, 2016

The Municipality of McDougall’s 4 Lagoons were in need of major renovation including relining. Fowler construction worked with Bishop Water to drain the lagoon cells of the sludge. The dewatered sludge was disposed of as landfill material.

DOWNLOAD PDF