Marine Remediation | DATE POSTED: April 28, 2016
Lowering of the floor by 8 metres within the Rijksmuseum cellar required soil dewatering using divers and Geotube® technology. The Geotube® project was designed to work quickly with minimum invasion.
DOWNLOAD PDF