Municipal | DATE POSTED: April 26, 2016
Working with the City of London, Bishop Water conducted a pilot project using a 30’ x 50’ Geotube® to dewater the ash before reaching the lagoon system. The successful pilot project was adapted to the award winning facility that now runs 24 hours day.
DOWNLOAD PDF