Light Industrial | DATE POSTED: April 26, 2016
The Arizona Chemical company’s waste settling equalization basin required emptying to meet Panama Cities discharge limits. The employed Geotube® technology was shown to capture the chemical laden thick and sticky sludge to such great success that three more units were installed removing 1065 tons of solids.
DOWNLOAD PDF