Lagoon Dewatering Solutions Case Study: The Town of Cobalt, Ontario

Municipal | DATE POSTED: April 26, 2016

The Town of Cobalt treats sewage using a constructed wetland. The maintenance forebay that captures the sludge in this process was full and required emptying. Story Environmental contacted Bishop Water to utilize 2, 30’ x 47’ Geotube® units to dewater this sludge. This project took 2 days in November 2009.

DOWNLOAD PDF